HPHT Planning and Operations

High Pressure (HP) (>10,000 psi) and High Temperature (HT) (>300°F) conditions are becoming more routine drilling targets worldwide in the pursuit of deep gas reserves. This course delivers a comprehensive review of HPHT well design, engineering and drilling requirements.

This introductory course provides an understanding of High-Pressure and High-Temperature (HPHT) drilling and completion operations. The course is specifically designed to provide an understanding of the challenges associated with the design and construction of HPHT wells. The course covers not only theory, technicalities and practicalities of drilling and completing HPHT wells but it also covers real examples and exercises.

The content emphasis in this course/workshop is placed on current regulatory and standard operating principles of HPHT – right from a well’s concept phase, through pre-planning, rig and equipment selection, the basis of well design, detailed design, engineering, offset study, and final drilling of the critical HPHT transition and reservoir zones. The challenges of geological risks and uncertainty with drilling fluids, cement design, equipment assurance and drilling problem prevention, solving and decision making, all require special attention. The course draws on several HPHT case studies from different drilling environments in conjunction with instructor-led facilitation, use of multi-media files and most importantly individual and group-led engagement sessions. The course equips a multi-disciplinary team to manage and control the drilling hazards and risks that exist in HPHT wells. This course also delivers a participative, practical program where individual and teamwork skills are developed to meet the HPHT drilling challenges presented.

Course Details

High Pressure (HP) (>10,000 psi) and High Temperature (HT) (>300°F) conditions are becoming more routine drilling targets...

  • Category: Drilling
  • complexity: Intermediate
  • Duration: 5 days
Enquiry
🗙

    Enquiry: